image 1 (1)

Port of Los Angeles Releases Draft Environmental Impact Report for Proposed Waterfront Amphitheater

Default img
LOS ANGELES – Port of Los Angeles has issued a Draft Subsequent Environmental Impact Report (Draft SEIR) related to the proposed West Harbor Modification Project, part of the 2009 San Pedro Waterfront EIS/EIR. The project proposes a 6,200-seat, 100,000-square-foot amphitheater on a 2.1-acre site leased to West Harbor, along with a 2,600-stall parking lot nearby in San Pedro for theatergoers and waterfront visitors. The Draft SEIR identifies significant and unavoidable impacts in areas such as air quality, greenhouse gas emissions, noise, and transportation. Prepared under the California Environmental Quality Act (CEQA), the Draft SEIR is available for public review on the Port of Los Angeles website at portoflosangeles.org/ceqa. A virtual public meeting is scheduled for 4 p.m. on Thursday, Nov. 14, via Zoom, with Spanish translation available. No registration is required. Public comments on the Draft SEIR can be submitted via email to [email protected] or by mail to the Director of Environmental Management at the Los Angeles Harbor Department, 425 South Palos Verdes Street, San Pedro, CA 90731. Comments should be submitted by Monday, Dec. 23, 2024, and email submissions should include “West Harbor Modification Project” in the subject line. For further details, visit portoflosangeles.org/ceqa or contact the Environmental Management Division at [email protected] or (310)...
Subscribe or log in to read the rest of this content.