Byline: The Log Staff
LONG BEACH — The Long Beach Board of Harbor Commissioners approved the Port of Long Beach staff’s recommendation May 14 that the “best value” design-build proposal to replace the aging Gerald Desmond Bridge was submitted by the joint venture team of Shimmick Construction Co. Inc., FCC Construction...